What licensing is required to install rooftop solar together with a roof?

Direct Answer

When rooftop solar is being installed as part of a commercial roofing project in Florida, the work generally involves more than one licensing and permitting discipline. The roofing portion must be performed by an appropriately licensed roofing contractor, while the photovoltaic (PV) electrical installation must be performed by a properly licensed contractor authorized to install photovoltaic systems. Depending on the project, engineering, structural review, building permits, electrical permits, and local jurisdiction requirements may also apply.

Florida DBPR identifies roofing and solar as separate contractor categories. A Florida roofing contractor’s scope covers installation, maintenance, repair, alteration, and related roofing work, while a solar contractor’s scope includes photovoltaic systems and their associated equipment. [Florida DBPR Construction Industry licensing information](https://www2.myfloridalicense.com/construction-industry/?utm_source=chatgpt.com)

Florida’s Electrical Contractors’ Licensing Board also specifically states that a license is required to install a photovoltaic system and that certified or registered electrical contractors may install solar-electric systems. [Florida DBPR Electrical Contractors FAQ](https://www2.myfloridalicense.com/electrical-contractors/faqs/?utm_source=chatgpt.com)

For a commercial building, the safest approach is to establish responsibility between the roofing contractor, solar contractor, engineer, and permitting authority before either system is installed. The roof must be capable of supporting the proposed solar system, penetrations and attachments must be properly detailed, and the finished installation must preserve the roof’s watertightness and warranty requirements.

Who This Applies To

  • Commercial property owners
  • Developers and general contractors
  • Facility and property managers
  • Commercial roofing contractors
  • Solar/PV contractors
  • Architects and engineers
  • Owners adding solar during a new roof installation
  • Owners installing solar on an existing commercial roof

Not for: This is general Florida commercial roofing and licensing guidance. Exact license, permit, engineering, and inspection requirements can vary by project and jurisdiction. Confirm the requirements with the applicable Florida licensing board and local building department before work begins.

1. Understand the Two Separate Scopes of Work

A rooftop solar-and-roof project should be divided into at least two primary scopes:

Scope Primary Responsibility Typical Work
Roofing Licensed roofing contractor Roof installation, membrane, flashing, penetrations, curbs, waterproofing and roof repairs
Photovoltaic system Licensed solar or electrical contractor authorized for PV work PV modules, racking, inverters, wiring and electrical interconnection
Structural design Qualified design professional where required Structural capacity, attachment and loading analysis
Permitting Owner/contractor/design team as required Building, roofing and electrical permits and inspections

Florida DBPR lists roofing contractors and solar contractors as distinct license categories. Its solar contractor definition includes installation, alteration, repair, maintenance, relocation, and replacement of photovoltaic systems and associated equipment. [Florida DBPR contractor categories](https://www2.myfloridalicense.com/construction-industry/?utm_source=chatgpt.com)

2. Roofing Work Requires the Appropriate Roofing License

The roofing portion of the project should be performed by a properly licensed roofing contractor.

Florida DBPR defines the roofing contractor category as covering installation, maintenance, repair, alteration, extension, and design/use of materials associated with roofing, waterproofing, and coating work. The scope also includes related work such as skylights and required roof-deck attachments. [Florida DBPR Roofing Contractor definition](https://www2.myfloridalicense.com/construction-industry/?utm_source=chatgpt.com)

This is important because installing solar often requires coordination with the roof membrane, flashing, attachment points, curbs, or other waterproofing details.

3. Photovoltaic Installation Requires Appropriate Licensing

Florida DBPR’s Electrical Contractors FAQ states directly that a license is required to install a photovoltaic system and that certified or registered electrical contractors can install solar-electric systems. [Florida DBPR Electrical Contractors FAQ](https://www2.myfloridalicense.com/electrical-contractors/faqs/?utm_source=chatgpt.com)

Florida DBPR also identifies a Certified Solar Contractor and Registered Solar Contractor category. The solar contractor scope expressly includes photovoltaic systems. [Florida DBPR Solar Contractor licensing information](https://www2.myfloridalicense.com/construction-industry/?utm_source=chatgpt.com)

Therefore, a property owner should not assume that a general roofing contractor can perform the electrical portion of the PV installation simply because the panels are mounted on the roof.

4. Do Not Confuse Solar Water Heating With Solar PV

Florida licensing rules distinguish photovoltaic systems from certain other solar technologies.

DBPR’s electrical FAQ states that photovoltaic solar-electric work falls within the scope of certified and registered electrical contractors, while solar water systems have different licensing requirements. [Florida DBPR Electrical Contractors FAQ](https://www2.myfloridalicense.com/electrical-contractors/faqs/?utm_source=chatgpt.com)

For commercial rooftop solar projects, the project team should therefore identify the exact technology and scope before selecting the contractor license category.

5. Determine Who Is Responsible for Roof Attachments

One of the most important coordination questions is who is responsible for the physical connection between the solar system and the roof.

Depending on the design, this can involve:

  • Ballasted solar racking
  • Mechanically attached racking
  • Roof penetrations
  • Structural attachments
  • Flashing
  • Equipment curbs
  • Conduit penetrations
  • Membrane boots
  • Waterproofing details

The contract documents should clearly identify which contractor installs, seals, inspects, and warranties each roof penetration or attachment.

6. Evaluate the Roof Before Installing Solar

Do not install a long-term solar system on a roof that is already approaching the end of its useful life without evaluating the sequencing decision.

Review:

  • Roof age
  • Roof system type
  • Remaining useful life
  • Membrane condition
  • Flashing condition
  • Existing leaks
  • Moisture within the roof assembly
  • Existing warranties
  • Structural capacity
  • Future roof replacement plans

If the roof needs replacement soon, installing solar first can create additional costs because the solar array may eventually need to be removed and reinstalled.

7. Coordinate Solar With a New Roof Before Installation

If the roof and solar system are being installed together, coordinate both scopes during design rather than treating solar as an afterthought.

The project team should establish:

  • Solar layout
  • Roof penetrations
  • Attachment locations
  • Structural requirements
  • Flashing details
  • Access pathways
  • Maintenance clearances
  • Drainage locations
  • Equipment locations
  • Roof warranty requirements

This reduces the risk of installing solar equipment over drains, creating inaccessible maintenance areas, or requiring unnecessary roof penetrations.

8. Check Structural Requirements

Solar panels and racking add loads to a commercial roof and can also introduce wind-related forces. The design team should determine whether structural review or engineering is required for the specific building and installation.

For example, the City of Miami’s commercial solar permit guidance requires plans and, for specified projects, a Florida-licensed engineer’s signed and sealed documentation. It also requires information concerning support and mounting details and a letter addressing whether the photovoltaic installation adversely affects the building structure under normal and hurricane conditions. [City of Miami commercial solar permit requirements](https://www.miami.gov/Permits-Construction/Permit-Catalog/Get-a-Permit-to-Install-Solar-Panels?utm_source=chatgpt.com)

Local requirements can differ, so the applicable building department should be consulted before finalizing the installation.

9. Obtain the Required Permits

A commercial rooftop solar installation generally requires permitting beyond simply hiring a licensed contractor.

Depending on the jurisdiction and project, this can involve:

  • Electrical permits
  • Building permits
  • Roofing permits
  • Structural review
  • Electrical plan review
  • Final inspections
  • Utility interconnection requirements

As one Florida example, the City of Miami specifically states that commercial solar projects require a separate stand-alone roofing permit in addition to the electrical stand-alone solar-panel permit. [City of Miami Solar Panel Permit Requirements](https://www.miami.gov/Permits-Construction/Permit-Catalog/Get-a-Permit-to-Install-Solar-Panels?utm_source=chatgpt.com)

This demonstrates why commercial owners should not assume that one solar permit covers all roofing and building work.

10. Verify the Contractor’s License Before Signing

Before hiring the contractor, verify the license directly through Florida’s licensing system.

DBPR provides online licensing information for certified solar contractors and other contractor categories. [Florida DBPR Certified Solar Contractor licensing portal](https://www.myfloridalicense.com/intentions2.asp?SID=&amp%3Bboardid=06&amp%3BchBoard=true&amp%3Bprofessionid=0611&utm_source=chatgpt.com)

For electrical work, Florida DBPR states that each electrical business must be qualified by a properly licensed individual contractor. [Florida DBPR Electrical Contractor business information](https://www2.myfloridalicense.com/electrical-contractors/electrical-contractors-business-information/?utm_source=chatgpt.com)

Owners should verify:

  • License category
  • License status
  • Qualifying contractor
  • Business entity
  • Scope of work
  • Insurance requirements
  • Whether the contractor is authorized to perform the proposed work

11. Coordinate the Roof Warranty With the Solar Contractor

Solar installation can affect the roof warranty if penetrations, attachments, membrane modifications, or other roof work are performed without following the manufacturer’s requirements.

Before installation, determine:

  • Whether the existing roof warranty permits solar installation
  • Whether the manufacturer must approve the work
  • Whether an approved roofing contractor must perform roof modifications
  • Who is responsible for flashing and waterproofing
  • Whether a manufacturer inspection is required
  • How future solar maintenance will be handled
  • How roof repairs will be coordinated with solar equipment

These requirements should be documented before construction begins, not after a leak develops.

12. Establish Responsibility for Future Roof Repairs

The contracts should also address what happens if the roof requires repair after the solar system has been installed.

Clarify:

  • Who removes and reinstalls panels
  • Who disconnects electrical equipment
  • Who protects the roof during solar work
  • Who pays for solar removal and reinstallation
  • Who restores waterproofing
  • Who performs final roof inspection
  • How warranty responsibilities are divided

This is particularly important for commercial owners planning a long-term roof lifecycle strategy.

13. Keep the Roofing and Solar Documentation Together

Maintain a combined project file containing:

  • Roofing contract
  • Solar contract
  • Contractor licenses
  • Roof plans
  • Solar plans
  • Structural calculations
  • Electrical plans
  • Permits
  • Inspection records
  • Product approvals
  • Manufacturer documentation
  • Roof warranty
  • Solar equipment warranties
  • Closeout documents

This documentation becomes particularly valuable if the property is sold, refinanced, insured, or requires future roof replacement.

14. What If the Existing Roof Is Under Warranty?

Do not allow a solar contractor to modify the roof without first reviewing the existing roof warranty.

Contact the roofing manufacturer or warranty provider and determine whether:

  • Solar installation is permitted
  • An approved contractor is required
  • Additional flashing details are required
  • Manufacturer observation is required
  • The warranty must be amended
  • Specific attachment systems are approved

Failure to coordinate these requirements can create disputes later about whether roof damage is covered by the roofing warranty or caused by the solar installation.

15. Bottom Line

For a Florida commercial project where rooftop solar is installed together with a roof, the owner should generally treat roofing and photovoltaic installation as coordinated but distinct scopes.

The roofing work should be performed under the appropriate roofing contractor license, while photovoltaic installation requires the appropriate solar or electrical licensing authority. Florida DBPR expressly identifies solar and roofing as separate contractor categories, and its electrical licensing guidance states that photovoltaic installation requires a license. [Florida DBPR Construction Industry licensing information](https://www2.myfloridalicense.com/construction-industry/?utm_source=chatgpt.com) [Florida DBPR Electrical Contractors FAQ](https://www2.myfloridalicense.com/electrical-contractors/faqs/?utm_source=chatgpt.com)

For commercial projects, also coordinate structural engineering, building and electrical permits, roof penetrations, manufacturer requirements, wind considerations, warranties, and final inspections. Local requirements can add additional permits or documentation, as illustrated by Miami’s commercial solar permitting requirements. [City of Miami commercial solar permit requirements](https://www.miami.gov/Permits-Construction/Permit-Catalog/Get-a-Permit-to-Install-Solar-Panels?utm_source=chatgpt.com)

Related Questions

Sources

Last reviewed: October 2026

Related Resources

Why Should a Commercial Roof Be Assessed Before Installing Solar?

Need Commercial Roofing Help?

ShieldLine Roofing can help commercial property owners evaluate an existing or new roof before solar installation, coordinate roof penetrations and attachment details, and protect the roof system and warranty during the project.

Disclaimer: This information is provided for general educational purposes and is not legal, licensing, engineering, permitting, insurance, or construction advice. Florida licensing and local permitting requirements can vary by project and jurisdiction. Confirm requirements with the applicable licensing authority, building department, engineer, roofing contractor, and solar/electrical contractor.

New Construction Commercial Roofing

Rylee Hage - Founder of Shieldline Roofing

Meet the Founder: Rylee Hage

  • • Over 15 years of mastery in the roofing industry, bridging the gap between standard service and meticulous craftsmanship.
  • • Founded Shieldline Roofing on the principles of unwavering integrity and a profound commitment to protecting families.
  • • Dedicated to providing a personalized client experience built on a foundation of absolute trust.