What documentation must be on-site during an HVHZ roof inspection?

Direct Answer

During a High-Velocity Hurricane Zone (HVHZ) roof inspection, the roofing contractor must have the applicable permit and approved roofing documents available at the job site for review by the building inspector. For roofing projects in Miami-Dade County, this generally includes the issued permit card, approved permit documents, the completed HVHZ Roof Permit Form Sections A and B with a roof plan, the applicable roofing system form, current product approval documentation, required fire-classification evidence, and completed owner notification forms.

Depending on the project, additional documents may include a recorded Notice of Commencement (NOC), applicable hurricane-mitigation forms, and manufacturer installation details. Spray polyurethane foam (SPF), single-ply membranes, built-up roofing (BUR), metal roofs, and tile roofs have different documentation and detail requirements.

Important: The exact checklist depends on the local building department, the roofing system, the permit type, and the inspection stage. Miami-Dade County’s requirements should not automatically be treated as identical to those of every jurisdiction in the HVHZ. Contractors should verify the current checklist for the specific project before requesting an inspection.

1. Core Documents to Keep at the Job Site

Issued Roofing Permit and Approved Documents

Keep the issued roofing permit card and the approved permit documents accessible to the inspector. The documents should correspond to the property, permitted scope of work, and roofing system being installed.

The approved documents help the inspector verify that the work follows the permitted assembly and details. If the proposed materials or installation differ from the approved documents, the contractor should determine whether a permit revision or other approval is required before proceeding.

Completed HVHZ Roof Permit Form — Sections A and B

Miami-Dade County identifies Sections A and B of the HVHZ Roof Permit Form as containing general project information, roof category and type, roof system information, and the roof plan.

The roof plan should accurately identify the applicable roof sections, dimensions, levels, and roof types as required by the permit process. The information must correspond to the actual building and permitted work.

Official form: HVHZ Roof Permit Form — Sections A and B.

Applicable Roofing System Form

The specific roofing system form identifies the components and installation details associated with the proposed roof assembly. The correct form depends on the system being installed.

  • Built-up roofing (BUR): The applicable BUR assembly form, including the required system components.
  • Single-ply roofing: The applicable single-ply membrane form and relevant detail forms.
  • Spray polyurethane foam (SPF): The SPF system form and applicable edge, wall flashing, coping, pipe flashing, support flashing, scupper, overflow scupper, and drain details.
  • Metal roofing: The applicable metal roof system form and required attachment and fire-classification documentation.
  • Tile roofing: The applicable tile system form and any required tile calculations or supporting documents.

Miami-Dade County lists these forms on its official Roofing Permits page.

2. Product Approval or Notice of Acceptance (NOA)

The applicable Florida Product Approval or Miami-Dade County Notice of Acceptance (NOA) is a key document for verifying that the proposed roofing system is approved for the intended application.

For a Miami-Dade County roof inspection, the applicable approval documentation may need to include:

  • Approval cover page: Identifies the approved product or system and its approval reference.
  • Assembly specifications: Identifies the particular roof assembly, materials, and installation method being used.
  • Limitations and conditions: Identifies restrictions on substrate, deck type, design pressure, installation conditions, and other relevant parameters.
  • Applicable component approvals: Provides documentation for additional components when required by the approved assembly or permit.

The contractor should verify that the approval applies to the actual roof deck, building conditions, and installation method. A product approval alone does not mean every configuration of that product is permitted.

Check approvals through the Florida Building Commission Product Approval Search or the Miami-Dade County Product Control and Approval resources.

3. Class A Fire-Classification Documentation

Where required for the proposed roofing assembly, the contractor should have the applicable Class A fire-classification or fire-listing documentation available. The listing should correspond to the proposed roof assembly and include the components required by the relevant approval and code provisions.

Miami-Dade County’s roofing guidance identifies fire-classification evidence as part of the documentation required for certain roof assemblies. The exact evidence depends on the roofing system and applicable permit requirements.

Do not assume that a fire rating for one product or assembly automatically applies to a different combination of insulation, cover board, membrane, foam, coating, or other components.

4. Owner Notification and Hurricane-Mitigation Forms

Owner’s Notification for Roofing Considerations

Miami-Dade County identifies the Owner’s Notification for Roofing Considerations as part of its roofing permit process. The form addresses conditions and considerations associated with roofing work and should be completed as required for the particular permit.

Official resource: Owner’s Notification for Roofing Considerations.

Applicable Hurricane-Mitigation Forms

Additional forms may be required when the project involves applicable roof-deck attachment, roof-to-wall connection, or secondary-water-barrier requirements. These requirements depend on the building type, project scope, and governing code provisions.

Do not assume that every hurricane-mitigation form applies to every commercial roof. Confirm the applicable forms with the local building department and the approved permit documents.

Notice of Commencement

Where required, the recorded Notice of Commencement (NOC) should be available at the job site by the applicable inspection stage. Miami-Dade County’s published roofing guidance identifies a recorded NOC among the documents required for certain projects at the first inspection.

Whether an NOC is required depends on the project and applicable law. Confirm the requirements for the specific permit rather than assuming that every roofing project follows the same rule.

5. Additional Documentation for SPF Roof Inspections

For spray polyurethane foam roofing in the HVHZ, contractors should pay particular attention to the system-specific forms and approved details. Depending on the project, the job-site documentation may include:

  • The applicable HVHZ SPF System Form.
  • Approved SPF edge details.
  • Wall flashing and coping details.
  • Pipe flashing and support flashing details, where applicable.
  • Wall scupper, overflow scupper, and drain details, where applicable.
  • The applicable product approval or NOA and its assembly specifications and limitations.
  • Any additional approved plans, installation instructions, or supporting documentation required by the permit or inspector.

These details are important because the roof perimeter, flashings, penetrations, and drainage features must be constructed in accordance with the approved system. The required documents will vary according to which details are present on the building.

Refer to the Miami-Dade County Roofing Permits page for the current SPF forms and applicable requirements.

HVHZ Roof Inspection Documentation Checklist

Document When It May Be Required
Issued roofing permit card For the permitted roofing work; keep it available for inspection.
Approved permit documents For verifying the approved scope and installation details.
HVHZ Roof Permit Form Sections A and B As required by the applicable Miami-Dade County roofing permit process.
Roof plan As part of the applicable permit documentation, showing required roof sections and dimensions.
Applicable roofing system form For the roof system being installed, such as SPF, BUR, single-ply, metal, or tile.
Product Approval or NOA For the proposed assembly and applicable components, including the relevant specifications and limitations.
Class A fire listing Where required for the proposed roof assembly.
Owner’s Notification for Roofing Considerations When required by the applicable permit process.
Hurricane-mitigation forms When applicable to the building, project scope, and governing requirements.
Recorded Notice of Commencement When required, including at the applicable inspection stage.
Manufacturer installation instructions and approved details When required by the approval, permit documents, or inspector.

6. How Can Contractors Avoid Inspection Delays?

Missing documents, incomplete forms, mismatched approvals, or discrepancies between the approved plans and the installed system can delay an inspection or lead to a failed inspection. Contractors can reduce these risks by preparing a project-specific document package before requesting the inspection.

  • Verify the jurisdiction: Confirm whether the project is inspected by Miami-Dade County or another local building department.
  • Use current forms: Obtain the applicable forms and checklist from the relevant building department.
  • Check the approval carefully: Match the approval number, assembly specifications, and limitations to the actual installation.
  • Confirm the roof plan: Ensure the roof layout and dimensions match the permitted work.
  • Complete required signatures and fields: Check that applicable forms are legible, complete, and signed where required.
  • Organize system details: Include the relevant SPF, membrane, edge, flashing, drain, coping, or other details for the system being installed.
  • Keep documents accessible: Ensure the inspector can review the required records at the job site.
  • Resolve discrepancies before inspection: Obtain any required permit revision or approval before proceeding with changed materials or installation details.

Bottom Line

HVHZ roof inspections require the contractor to make the applicable permit, approved roof documents, system-specific forms, product approval or NOA, and other required supporting records available for review. Depending on the project, these may include Class A fire-classification documentation, owner notification paperwork, hurricane-mitigation forms, a recorded Notice of Commencement, and SPF-specific installation details.

The exact checklist is determined by the local building department, the roofing system, the permit, and the inspection stage. For Miami-Dade County projects, start with the official Roofing Permits page and confirm the requirements for the specific project before scheduling an inspection.

Related Questions

Sources

Last reviewed: October 2026

Related Resource

For information about protecting and restoring commercial roofing systems, visit Commercial Roof Coatings & Restoration.

Commercial Roof Coatings & Restoration

Proper roof maintenance and restoration involve selecting compatible materials, following approved installation requirements, and keeping the roofing system in good condition. ShieldLine Roofing helps commercial property owners assess their existing roof and explore suitable coating and restoration options for South Florida properties.

Explore Commercial Roof Coatings & Restoration to learn more about available services.

Rylee Hage - Founder of Shieldline Roofing

Meet the Founder: Rylee Hage

  • • Over 15 years of mastery in the roofing industry, bridging the gap between standard service and meticulous craftsmanship.
  • • Founded Shieldline Roofing on the principles of unwavering integrity and a profound commitment to protecting families.
  • • Dedicated to providing a personalized client experience built on a foundation of absolute trust.