Pompano Beach Factory Roof Restoration: 110K Sq. Ft. Cool Roof Case Study

Essential Project Data and Zero-Interruption Logistics Strategy
| Primary Service | Industrial Roofing – Fluid-Applied Restoration |
| Category | Manufacturing / Light Industrial Factory |
| Location | Pompano Beach, FLÂ |
| Client Type | Regional Manufacturing Firm / Industrial Asset Manager |
| Property Type | Single-Story, Low-Slope Production and Assembly Facility |
| Roof System | Aged Modified Bitumen (Mod-Bit) |
| New System | High-Solids Silicone Fluid-Applied Roof System (FARS) |
| Total Area | 110,000 Square Feet (Large Industrial Scale) |
| Project Duration | 9 Weeks, Phased Zero-Interruption Schedule |
The Challenge: Massive Heat Load and Production Risk in Pompano Beach
This 110,000 sq. ft. Pompano Beach manufacturing facility was struggling with an outdated, dark Modified Bitumen roof that was suffering from thermal shock, cracking, and widespread ponding water. The critical issues were twofold:
- Extreme Heat Load: The black roof surface was absorbing massive amounts of South Florida heat, causing significant thermal stress to the structure and spiking the energy consumption for cooling the vast factory floor and production equipment.
- Production Interruption: Leaks posed a direct threat to sensitive machinery and inventory. The client strictly mandated a solution that required zero tear-off and absolutely no interruption to the 24/7 assembly lines.
A full, noisy tear-off was unacceptable. The solution had to be seamless, highly reflective, and installable during regular factory operations.
The Solution: High-Performance Silicone Coating for Energy Savings and Zero Disruption
We recommended a full restoration using a cutting-edge, 100% High-Solids Silicone Fluid-Applied Roof System (FARS). This decision enabled us to achieve a complete watertight system with maximum energy efficiency, all without stopping the plant’s production.
The Technical Why: Silicone for Industrial Energy and Assets
- Cool Roof Technology (ROI Focus): The bright white finish boasts a superior Solar Reflectance Index (SRI). By reflecting up to 90% of solar energy, the coating drastically reduced the surface temperature, translating into substantial, verifiable savings on cooling costs.
- Monolithic & Seamless Waterproofing: The fluid-applied process created a single, monolithic membrane over the entire 110,000 sq. ft., permanently sealing the surface and eliminating the 100+ seams and patches that were failing on the old Mod-Bit system.
- Low-Odor Installation: The low-VOC (Volatile Organic Compound) nature of the silicone system ensured the process was virtually odorless, preventing fumes from migrating into the production areas and assembly lines.
The Process (Step-by-Step): Phased Execution for Industrial Continuity
Our method focused on strict zoning, safety, and production maintenance:
- Moisture and Deck Audit: An intensive Infrared Moisture Survey was conducted to pinpoint all areas of trapped moisture. Only these isolated saturated areas were surgically removed and replaced, minimizing waste and structural exposure.
- Surface Preparation and Cleaning: The entire Mod-Bit surface underwent a rigorous deep clean and power wash to remove debris, ensuring the silicone would achieve maximum adhesion to the existing membrane.
- Critical Detailing: All pipe penetrations, equipment curbs, and perimeter flashing were reinforced with embedded polyester fabric and silicone base coat to create strong, durable seals at all transition points.
- Phased Zoning and Logistics: The project was executed in isolated, multi-week zones. Work areas were contained, and material logistics were tightly managed to guarantee that no phase of the work impacted facility access or production schedules.
Results & Value Delivered
The Pompano Beach factory received a long-term, high-performance roof that immediately improved its operational efficiency and reduced its environmental footprint.
| Value Delivered | Impact |
| Long-Term Protection | Issued a 20-Year, Non-Prorated Manufacturer’s Warranty, significantly extending the asset’s lifecycle and deferring future capital expense. |
| Energy Savings | The new Cool Roof coating achieved an estimated 18-25% reduction in the factory’s annual cooling electricity consumption, providing a rapid ROI. |
| Zero Production Loss | The non-invasive, phased schedule successfully ensured 100% continuous operation for the manufacturing plant. |
| Asset Security | The monolithic seal provided immediate, guaranteed leak-free protection for sensitive interior machinery and production areas. |




Client Feedback
Frequently Asked Questions (FAQ) for Factory & Industrial Roofing
Q: Can a roof coating protect against strong winds and South Florida storms?
A: Yes. When properly installed over a sound substrate, a fully adhered silicone coating system provides a seamless, flexible envelope that resists wind-driven rain penetration better than a seamed membrane. The system’s adhesion to the entire deck provides excellent resistance to wind uplift.
Q: How long does the energy savings (ROI) take to realize on a factory roof coating?
A: Energy savings are immediate. The reflective properties of the white silicone coating reduce the roof surface temperature by up to 50°F instantly. Depending on the size of the roof and local energy costs, the system often pays for itself through utility bill reductions within 5 to 7 years.